The Korte Company has come up with an infographic to use in marketing its design-build services. It uses data from McGraw-Hill Construction and the Journal of Construction Engineering and Management to make a cogent argument that design-build is the most efficient project delivery method. This infographic suggests that design-build can produce a project cost estimate about three months before traditional construction methods.
Click on the URL below to review the infographic.